MediaWiki API result
This is the HTML representation of the JSON format. HTML is good for debugging, but is unsuitable for application use.
Specify the format parameter to change the output format. To see the non-HTML representation of the JSON format, set format=json.
See the complete documentation, or the API help for more information.
{
"batchcomplete": "",
"continue": {
"gapcontinue": "TC_-_SECTION_1:_REFERENCES_AND_DEFINITIONS",
"continue": "gapcontinue||"
},
"warnings": {
"main": {
"*": "Subscribe to the mediawiki-api-announce mailing list at <https://lists.wikimedia.org/mailman/listinfo/mediawiki-api-announce> for notice of API deprecations and breaking changes."
},
"revisions": {
"*": "Because \"rvslots\" was not specified, a legacy format has been used for the output. This format is deprecated, and in the future the new format will always be used."
}
},
"query": {
"pages": {
"219": {
"pageid": 219,
"ns": 0,
"title": "Standard Specifications For Construction And Materials",
"revisions": [
{
"contentformat": "text/x-wiki",
"contentmodel": "wikitext",
"*": "====== This is not the official version of the Standard Specifications for Construction and Materials. This version includes the latest Standard Specifications for Construction and Materials, as well as revisions approved through the Special Provisions Insert (SPI) process. Refer to the Invitation for Bids in the Contract Documents for specifications pertaining to contract work. Please see [https://www.roads.maryland.gov/mdotsha/pages/sscm.aspx?PageId=853&lid=SSP Standard Specifications for Construction and Materials] for the official version. ======\n\n\n__NOTOC__\n\n==[[PART I: GENERAL PROVISIONS|PART I: GENERAL PROVISIONS]]==\n==[[PART II: TERMS AND CONDITIONS|PART II: TERMS AND CONDITIONS]]==\n==PART III: TECHNICAL REQUIREMENTS==\n===[[CATEGORY 100 - PRELIMINARY|CATEGORY 100 - PRELIMINARY]]===\n===[[CATEGORY 200 - GRADING|CATEGORY 200 - GRADING]]===\n===[[CATEGORY 300 - DRAINAGE|CATEGORY 300 - DRAINAGE]]===\n===[[CATEGORY 400 - STRUCTURES|CATEGORY 400 - STRUCTURES]]===\n===[[CATEGORY 500 - PAVING|CATEGORY 500 - PAVING]]===\n===[[CATEGORY 600-SHOULDERS|CATEGORY 600 - SHOULDERS]]===\n===[[CATEGORY 700-LANDSCAPING|CATEGORY 700 - LANDSCAPING]]===\n===[[CATEGORY 800-TRAFFIC|CATEGORY 800 - TRAFFIC]]===\n===[[CATEGORY 900-MATERIALS|CATEGORY 900 - MATERIALS]]===\n\n[[Category:Standard Specifications For Construction And Materials]]"
}
]
},
"167": {
"pageid": 167,
"ns": 0,
"title": "TC-4.02 Failure to Adequately Maintain Project",
"revisions": [
{
"contentformat": "text/x-wiki",
"contentmodel": "wikitext",
"*": "GP 5.12 (Failure to Maintain Entire Project) is not applicable to Administration Contracts. The provisions of this TC shall apply.\n\t\nIf the Contractor, at any time, fails to respond to the provisions of GP 5.11 (Maintenance of Work During Construction), the procurement officer will immediately notify the Contractor to comply with the required maintenance provisions. If corrective actions do not begin within four hours after receipt of the notice, the procurement officer may:\n\n:'''(a)''' Notify the contractor to suspend all other work until the unsatisfactory maintenance is corrected, or\n\n:'''(b)''' Proceed at anytime with adequate forces and equipment to maintain the project. The entire cost of this maintenance will be deducted from monies due the Contractor on the next progress payment.\n\n[[Category:Standard Specifications For Construction And Materials]]"
}
]
}
}
}
}