301.01 DESCRIPTION
Excavate below the specified elevation when unsuitable subgrade material is encountered.
301.02 MATERIALS
Not applicable.
301.03 CONSTRUCTION
Excavate to the length, width, and depth at authorized locations. Handle excavated material as specified in 402.03.01.
301.04 MEASUREMENT AND PAYMENT
Class 3 Excavation for Incidental Construction will be measured and paid for at the Contract unit price per cubic yard. The payment will be full compensation for all material, labor, equipment, tools, and incidentals necessary to complete the work.