Difference between revisions of "CATEGORY 200 - GRADING"
Jump to navigation
Jump to search
(Created page with "===201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2)=== ===202 CHANNEL OR STREAM CHANGE EXCAVATION (CLASS 5)|202...") |
(No difference)
|
Revision as of 20:44, 25 February 2017
Contents
- 1 201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2)
- 2 202 CHANNEL OR STREAM CHANGE EXCAVATION (CLASS 5)
- 3 203 BORROW EXCAVATION
- 4 204 EMBANKMENT AND SUBGRADE
- 5 205 TEST PIT EXCAVATION
- 6 206 REMOVAL OF EXISTING PAVEMENT, SIDEWALK, PAVED DITCHES, CURB, OR COMBINATION CURB AND GUTTER
- 7 207 REMOVAL OF EXISTING MASONRY
- 8 208 SUBGRADE PREPARATION
- 9 209 TRIMMING EXISTING DITCHES
- 10 210 TAMPED FILL
- 11 211 GEOSYNTHETIC STABILIZED SUBGRADE USING GRADED AGGREGATE BASE