User contributions
Jump to navigation
Jump to search
- 12:22, 17 May 2021 diff hist 0 605 METAL TRAFFIC BARRIERS →605.04 MEASUREMENT AND PAYMENT current
- 18:01, 5 April 2021 diff hist +62 612 CABLE BARRIER SYSTEM →612.04 MEASUREMENT AND PAYMENT
- 17:58, 5 April 2021 diff hist +40 612 CABLE BARRIER SYSTEM →612.03 CONSTRUCTION
- 17:54, 5 April 2021 diff hist +58 612 CABLE BARRIER SYSTEM →612.02 MATERIALS
- 17:49, 5 April 2021 diff hist +79 612 CABLE BARRIER SYSTEM →612.02 MATERIALS
- 17:37, 5 April 2021 diff hist +20 606 PERMANENT TRAFFIC BARRIER END TREATMENTS →606.03 CONSTRUCTION
- 17:27, 5 April 2021 diff hist +45 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION current
- 17:22, 5 April 2021 diff hist +21 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 17:17, 5 April 2021 diff hist +3 605 METAL TRAFFIC BARRIERS →605.03 CONSTRUCTION
- 14:43, 5 April 2021 diff hist 0 612 CABLE BARRIER SYSTEM →603.04 MEASUREMENT AND PAYMENT
- 14:43, 5 April 2021 diff hist 0 612 CABLE BARRIER SYSTEM →605.03 CONSTRUCTION
- 14:26, 5 April 2021 diff hist +31 606 PERMANENT TRAFFIC BARRIER END TREATMENTS →606.03 CONSTRUCTION
- 14:18, 5 April 2021 diff hist -49 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 14:14, 5 April 2021 diff hist +49 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 13:46, 5 April 2021 diff hist +108 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 20:06, 1 April 2021 diff hist +9,717 612 CABLE BARRIER SYSTEM
- 13:00, 1 April 2021 diff hist 0 612 CABLE BARRIER SYSTEM →603.01 DESCRIPTION
- 13:00, 1 April 2021 diff hist +48 612 CABLE BARRIER SYSTEM
- 12:57, 1 April 2021 diff hist +122 N 612 CABLE BARRIER SYSTEM Created page with "======This is not a legal document. Please see disclaimer for more information.======"
- 12:50, 1 April 2021 diff hist +60 CATEGORY 600-SHOULDERS current
- 20:46, 31 March 2021 diff hist +1,539 917 MISCELLANEOUS PROTECTIVE COATINGS →917.03 FUSION BONDED POLYESTER POWDER current
- 13:17, 31 March 2021 diff hist -375 606 PERMANENT TRAFFIC BARRIER END TREATMENTS →606.04 MEASUREMENT AND PAYMENT
- 13:13, 31 March 2021 diff hist -1,084 606 PERMANENT TRAFFIC BARRIER END TREATMENTS →606.03 CONSTRUCTION
- 12:44, 31 March 2021 diff hist +524 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 20:04, 30 March 2021 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →510.03 CONSTRUCTION current
- 18:18, 5 October 2020 diff hist +1 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.04 MEASUREMENT AND PAYMENT current
- 17:49, 5 October 2020 diff hist -802 951 PAVEMENT MARKING MATERIALS →951.07 SNOWPLOWABLE RAISED AND NON-SNOWPLOWABLE RAISED PAVEMENT MARKERS current
- 14:26, 5 October 2020 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →505.04 MEASUREMENT AND PAYMENT
- 14:26, 5 October 2020 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →505.03 CONSTRUCTION
- 14:26, 5 October 2020 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.02 MATERIALS
- 14:26, 5 October 2020 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.01 DESCRIPTION
- 14:22, 5 October 2020 diff hist +134 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS
- 14:16, 5 October 2020 diff hist +13,323 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.02 MATERIALS
- 13:29, 5 October 2020 diff hist +206 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.01 DESCRIPTION
- 13:13, 5 October 2020 diff hist +279 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.01 DESCRIPTION
- 13:12, 5 October 2020 diff hist +36 N 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS Created page with "======'''511.01 DESCRIPTION'''======"
- 13:08, 5 October 2020 diff hist -23 CATEGORY 500 - PAVING →510 FILLING AND SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS
- 19:31, 2 October 2020 diff hist -84 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.04 MEASUREMENT AND PAYMENT
- 19:29, 2 October 2020 diff hist -532 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.03 CONSTRUCTION
- 15:03, 2 October 2020 diff hist +100 911 JOINTS →911.01 JOINT SEALER AND CRACK FILLER current
- 14:31, 2 October 2020 diff hist +13 507 SLURRY SEAL AND MICRO-SURFACING →507.04 MEASUREMENT AND PAYMENT. current
- 14:27, 2 October 2020 diff hist -129 507 SLURRY SEAL AND MICRO-SURFACING →507.03 CONSTRUCTION.
- 14:15, 2 October 2020 diff hist +63 505 ASPHALT PATCHES →505.04 MEASUREMENT AND PAYMENT current
- 14:14, 2 October 2020 diff hist +177 505 ASPHALT PATCHES →505.03 CONSTRUCTION
- 14:10, 2 October 2020 diff hist 0 505 ASPHALT PATCHES →505.02 MATERIALS
- 13:50, 2 October 2020 diff hist +36 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION current
- 13:47, 2 October 2020 diff hist 0 504 ASPHALT PAVEMENT →504.02 MATERIALS
- 13:46, 2 October 2020 diff hist 0 505 ASPHALT PATCHES →505.02 MATERIALS
- 13:45, 2 October 2020 diff hist 0 505 ASPHALT PATCHES →505.02 MATERIALS
- 20:08, 1 October 2020 diff hist +1,267 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.02 MATERIALS current
- 20:01, 1 October 2020 diff hist +2 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.02 MATERIALS
- 19:55, 1 October 2020 diff hist +74 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.02 MATERIALS
- 19:42, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.17.02 MATERIAL
- 19:41, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.14.02 MATERIALS
- 19:40, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.13.02 MATERIALS
- 19:39, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.12.02 MATERIALS
- 19:38, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.10.02 MATERIALS
- 19:37, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.09.02 MATERIALS
- 19:36, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.08.02 MATERIALS
- 19:35, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.06.02 MATERIALS.
- 19:34, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.05.02 MATERIALS
- 19:33, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.04.02 MATERIALS
- 19:22, 1 October 2020 diff hist +64 104 MAINTENANCE OF TRAFFIC →104.23.02 MATERIALS
- 19:07, 1 October 2020 diff hist +399 104 MAINTENANCE OF TRAFFIC →104.23.02 MATERIALS
- 19:05, 1 October 2020 diff hist -587 104 MAINTENANCE OF TRAFFIC →104.23.01 DESCRIPTION
- 19:01, 1 October 2020 diff hist +85 104 MAINTENANCE OF TRAFFIC →104.17.02 MATERIAL
- 18:59, 1 October 2020 diff hist +136 104 MAINTENANCE OF TRAFFIC →104.14.02 MATERIALS
- 18:56, 1 October 2020 diff hist +90 104 MAINTENANCE OF TRAFFIC →104.13.02 MATERIALS
- 18:53, 1 October 2020 diff hist +136 104 MAINTENANCE OF TRAFFIC →104.12.02 MATERIALS
- 18:49, 1 October 2020 diff hist +84 104 MAINTENANCE OF TRAFFIC →104.10.02 MATERIALS
- 18:45, 1 October 2020 diff hist +120 104 MAINTENANCE OF TRAFFIC →104.09.02 MATERIALS
- 18:44, 1 October 2020 diff hist +111 104 MAINTENANCE OF TRAFFIC →104.08.02 MATERIALS
- 18:42, 1 October 2020 diff hist +145 104 MAINTENANCE OF TRAFFIC →104.06.02 MATERIALS.
- 18:41, 1 October 2020 diff hist +84 104 MAINTENANCE OF TRAFFIC →104.05.02 MATERIALS
- 18:39, 1 October 2020 diff hist +83 104 MAINTENANCE OF TRAFFIC →104.04.02 MATERIALS
- 18:26, 1 October 2020 diff hist +5 104 MAINTENANCE OF TRAFFIC →104.00 GENERAL
- 18:19, 1 October 2020 diff hist +265 TC - SECTION 2: BIDDING REQUIREMENTS AND CONDITIONS →TC-2.05 DELIVERY OF BIDS current
- 18:14, 1 October 2020 diff hist -38 TC - SECTION 2: BIDDING REQUIREMENTS AND CONDITIONS →TC-2.05 DELIVERY OF BIDS
- 18:05, 1 October 2020 diff hist -12 TC - SECTION 2: BIDDING REQUIREMENTS AND CONDITIONS →TC-2.03 PREPARATION OF BID
- 17:59, 1 October 2020 diff hist +125 GP - SECTION 8: PROSECUTION AND PROGRESS →GP-8.08 TERMINATION FOR DEFAULT-DAMAGES FOR DELAY-TIME EXTENSIONS current
- 13:45, 23 July 2020 diff hist +2,457 920 LANDSCAPING MATERIALS →920.06 SEED AND TURFGRASS SOD STANDARDS current
- 13:46, 21 July 2020 diff hist +278 920 LANDSCAPING MATERIALS →920.07 PLANT MATERIALS
- 13:37, 21 July 2020 diff hist +427 920 LANDSCAPING MATERIALS →920.06 SEED AND TURFGRASS SOD STANDARDS
- 13:20, 21 July 2020 diff hist +284 920 LANDSCAPING MATERIALS →920.06 SEED AND TURFGRASS SOD STANDARDS
- 13:08, 21 July 2020 diff hist +142 920 LANDSCAPING MATERIALS →920.06 SEED AND TURFGRASS SOD STANDARDS
- 12:55, 21 July 2020 diff hist +355 920 LANDSCAPING MATERIALS →920.05 SOIL STABILIZATION MATTING
- 12:43, 21 July 2020 diff hist +213 920 LANDSCAPING MATERIALS →920.03 FERTILIZERS
- 19:21, 20 July 2020 diff hist +31 951 PAVEMENT MARKING MATERIALS →951.05 THERMOPLASTIC PAVEMENT MARKINGS - 40-mil HIGH BINDER
- 19:10, 20 July 2020 diff hist +32 951 PAVEMENT MARKING MATERIALS →951.04 THERMOPLASTIC PAVEMENT MARKINGS
- 18:23, 20 July 2020 diff hist +58 950 TRAFFIC MATERIALS →950.15 TRAFFIC SIGNAL HEADS current
- 20:13, 17 July 2020 diff hist +15 926 FOAMED ASPHALT STABILIZED BASE COURSE MIX →926.01 MIX REQUIREMENTS current
- 19:51, 17 July 2020 diff hist +64 925 DETECTABLE WARNING SURFACES →925.07 PHYSICAL PROPERTIES current
- 19:35, 17 July 2020 diff hist +65 922 PREFABRICATED EDGE DRAINS →922.02 PREFABRICATED EDGE DRAINS current
- 19:20, 17 July 2020 diff hist +253 920 LANDSCAPING MATERIALS →920.04 MULCHES
- 19:09, 17 July 2020 diff hist +90 920 LANDSCAPING MATERIALS →920.02 SOIL AMENDMENTS
- 19:03, 17 July 2020 diff hist +790 920 LANDSCAPING MATERIALS →920.01 SOILS
- 18:44, 17 July 2020 diff hist +71 920 LANDSCAPING MATERIALS →920.01 SOILS
- 18:43, 17 July 2020 diff hist +71 920 LANDSCAPING MATERIALS →920.01 SOILS
- 18:38, 17 July 2020 diff hist +71 920 LANDSCAPING MATERIALS →920.01 SOILS
- 19:58, 16 July 2020 diff hist +74 919 GEOTEXTILES →919 GEOTEXTILES current
- 19:39, 16 July 2020 diff hist +702 911 JOINTS →911.11 DRAINAGE TROUGHS
- 19:22, 16 July 2020 diff hist +108 911 JOINTS →911.09 ASPHALT SEALER FOR CONCRETE PIPE
- 19:21, 16 July 2020 diff hist +162 911 JOINTS →911.08 WATER STOPS
- 19:16, 16 July 2020 diff hist +1,045 911 JOINTS →911.06 SEALER FOR LOOP DETECTOR
- 18:56, 16 July 2020 diff hist +432 911 JOINTS →911.05 NEOPRENE STRIP SEALS
- 18:41, 16 July 2020 diff hist +426 911 JOINTS →911.01 JOINT SEALER AND CRACK FILLER
- 18:21, 16 July 2020 diff hist +324 907 PILES AND PILING →907.01 TIMBER PILING current
- 18:10, 16 July 2020 diff hist +864 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.05 GAP-GRADED STONE MATRIX ASPHALT (GGSMA) current
- 18:04, 16 July 2020 diff hist +162 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.05 GAP-GRADED STONE MATRIX ASPHALT (GGSMA)
- 18:00, 16 July 2020 diff hist +648 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.04 ASPHALT MIXES
- 17:52, 16 July 2020 diff hist +135 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.04 ASPHALT MIXES
- 17:42, 16 July 2020 diff hist +270 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.04 ASPHALT MIXES
- 12:35, 14 July 2020 diff hist +38 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 12:23, 14 July 2020 diff hist +87 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.17 SELF CONSOLIDATING CONCRETE (SCC)
- 20:08, 13 July 2020 diff hist +2 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 12:23, 9 July 2020 diff hist +35 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 20:00, 8 July 2020 diff hist +44 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:47, 8 July 2020 diff hist +729 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:39, 8 July 2020 diff hist +1,755 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:23, 8 July 2020 diff hist -122 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:20, 8 July 2020 diff hist +1 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:16, 8 July 2020 diff hist +77 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:08, 8 July 2020 diff hist +44 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 17:26, 8 July 2020 diff hist +108 711 ANNUALS AND BULBS INSTALLATION AND ESTABLISHMENT →711.03 CONSTRUCTION current
- 17:22, 8 July 2020 diff hist +27 711 ANNUALS AND BULBS INSTALLATION AND ESTABLISHMENT →711.03 CONSTRUCTION
- 13:27, 6 July 2020 diff hist +641 711 ANNUALS AND BULBS INSTALLATION AND ESTABLISHMENT →711.04 MEASUREMENT AND PAYMENT
- 12:51, 6 July 2020 diff hist +365 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.04 MEASUREMENT AND PAYMENT current
- 12:28, 6 July 2020 diff hist +45 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 12:22, 6 July 2020 diff hist +44 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 20:07, 2 July 2020 diff hist +18 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 19:21, 2 July 2020 diff hist +1,071 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 18:49, 2 July 2020 diff hist +27 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 18:31, 2 July 2020 diff hist +20 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 17:26, 2 July 2020 diff hist +78 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.04 MEASUREMENT AND PAYMENT current
- 17:14, 2 July 2020 diff hist +153 506 GAP-GRADED STONE MATRIX ASPHALT →506.04 MEASUREMENT AND PAYMENT. current
- 17:08, 2 July 2020 diff hist +178 504 ASPHALT PAVEMENT →504.04 MEASUREMENT AND PAYMENT
- 16:55, 2 July 2020 diff hist +20 111 SAMPLING DEVICES, TESTING AND SAFETY EQUIPMENT →111.03 CONSTRUCTION current
- 16:51, 2 July 2020 diff hist +42 104 MAINTENANCE OF TRAFFIC →104.07.03 CONSTRUCTION
- 15:57, 2 July 2020 diff hist +21 470 UTILITIES ON STRUCTURES →470.02 MATERIALS current
- 15:29, 2 July 2020 diff hist -21 470 UTILITIES ON STRUCTURES →470.02 MATERIALS
- 19:54, 1 July 2020 diff hist +6 111 SAMPLING DEVICES, TESTING AND SAFETY EQUIPMENT →111.03 CONSTRUCTION
- 19:39, 1 July 2020 diff hist +6 104 MAINTENANCE OF TRAFFIC →104.07.03 CONSTRUCTION
- 17:28, 22 June 2020 diff hist -4 915 PRODUCTION PLANTS →915.05 CERTIFIED PRECAST CONCRETE PLANTS
- 17:06, 22 June 2020 diff hist -1 915 PRODUCTION PLANTS →915.05 CERTIFIED PRECAST CONCRETE PLANTS
- 15:39, 22 June 2020 diff hist -15 915 PRODUCTION PLANTS →915.03 PORTLAND CEMENT CONCRETE PLANTS
- 15:31, 22 June 2020 diff hist +4 915 PRODUCTION PLANTS →915.03 PORTLAND CEMENT CONCRETE PLANTS
- 11:49, 18 June 2020 diff hist -48 308 EROSION AND SEDIMENT CONTROL →308.03 CONSTRUCTION
- 11:43, 18 June 2020 diff hist 0 714 TREE FELLING AND STUMP REMOVAL →714.03 CONSTRUCTION current
- 11:41, 18 June 2020 diff hist 0 712 TREE BRANCH PRUNING →712.03 CONSTRUCTION current
- 13:25, 10 June 2020 diff hist +1 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION current
- 13:14, 10 June 2020 diff hist 0 521 CONTINUOUSLY REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT →521.03 CONSTRUCTION current
- 13:12, 10 June 2020 diff hist 0 521 CONTINUOUSLY REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT →521.01 DESCRIPTION
- 13:10, 10 June 2020 diff hist 0 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.04 MEASUREMENT AND PAYMENT
- 13:09, 10 June 2020 diff hist +24 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.03 CONSTRUCTION
- 13:03, 10 June 2020 diff hist +24 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.02 MATERIALS
- 13:02, 10 June 2020 diff hist 0 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.01 DESCRIPTION
- 12:56, 10 June 2020 diff hist -2 513 FOAMED ASPHALT STABILIZED BASE COURSE →513.03 CONSTRUCTION current
- 12:37, 10 June 2020 diff hist +8 512 SURFACE ABRASION →512.03 CONSTRUCTION current
- 12:27, 10 June 2020 diff hist -1 511 OPEN GRADED FRICTION COURSE →511.03 CONSTRUCTION current
- 12:26, 10 June 2020 diff hist +50 511 OPEN GRADED FRICTION COURSE →511.03 CONSTRUCTION
- 12:22, 10 June 2020 diff hist +43 510 FILLING AND SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →510.03 CONSTRUCTION current
- 12:06, 10 June 2020 diff hist +12 509 DIAMOND GRINDING →509.03 CONSTRUCTION current
- 20:06, 9 June 2020 diff hist +24 508 MILLING ASPHALT PAVEMENT →508.04 MEASUREMENT AND PAYMENT current
- 20:04, 9 June 2020 diff hist +1 508 MILLING ASPHALT PAVEMENT →508.03 CONSTRUCTION
- 20:04, 9 June 2020 diff hist +34 508 MILLING ASPHALT PAVEMENT →508.03 CONSTRUCTION
- 19:55, 9 June 2020 diff hist +21 507 SLURRY SEAL AND MICRO-SURFACING →507.04 MEASUREMENT AND PAYMENT.
- 19:51, 9 June 2020 diff hist +69 507 SLURRY SEAL AND MICRO-SURFACING →507.03 CONSTRUCTION.
- 19:38, 9 June 2020 diff hist +8 507 SLURRY SEAL AND MICRO-SURFACING →507.02 MATERIALS.
- 19:33, 9 June 2020 diff hist +46 506 GAP-GRADED STONE MATRIX ASPHALT →506.03 CONSTRUCTION.
- 19:28, 9 June 2020 diff hist +8 506 GAP-GRADED STONE MATRIX ASPHALT →506.02 MATERIALS.
- 19:25, 9 June 2020 diff hist +6 505 ASPHALT PATCHES →505.03 CONSTRUCTION
- 19:19, 9 June 2020 diff hist +24 505 ASPHALT PATCHES →505.02 MATERIALS
- 19:11, 9 June 2020 diff hist +13 504 ASPHALT PAVEMENT →504.04 MEASUREMENT AND PAYMENT
- 19:08, 9 June 2020 diff hist +15 504 ASPHALT PAVEMENT →504.04 MEASUREMENT AND PAYMENT
- 19:05, 9 June 2020 diff hist +9 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION
- 18:58, 9 June 2020 diff hist +50 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION
- 18:51, 9 June 2020 diff hist +28 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION
- 18:49, 9 June 2020 diff hist +61 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION
- 18:41, 9 June 2020 diff hist +8 504 ASPHALT PAVEMENT →504.02 MATERIALS
- 18:35, 9 June 2020 diff hist +1 503 CHIP SEAL SURFACE TREATMENT →503.03 CONSTRUCTION. current
- 18:31, 9 June 2020 diff hist +1 502 SOIL-CEMENT BASE COURSE →502.03 CONSTRUCTION.
- 18:30, 9 June 2020 diff hist +9 502 SOIL-CEMENT BASE COURSE →502.03 CONSTRUCTION.
- 18:27, 9 June 2020 diff hist +8 502 SOIL-CEMENT BASE COURSE →502.02 MATERIALS.
- 18:27, 9 June 2020 diff hist 0 502 SOIL-CEMENT BASE COURSE →502.01 DESCRIPTION.
- 18:22, 9 June 2020 diff hist 0 501 AGGREGATE BASE COURSES →501.04 MEASUREMENT AND PAYMENT.
- 18:20, 9 June 2020 diff hist +36 501 AGGREGATE BASE COURSES →501.03 CONSTRUCTION.
- 18:06, 9 June 2020 diff hist 0 501 AGGREGATE BASE COURSES →501.01 DESCRIPTION.
- 18:01, 9 June 2020 diff hist +18 405 REMOVAL OF EXISTING STRUCTURES →405.03 CONSTRUCTION current
- 17:49, 9 June 2020 diff hist +4 404 PROTECTION OF EXISTING STRUCTURES →404.03 CONSTRUCTION current
- 17:42, 9 June 2020 diff hist +17 402 STRUCTURE EXCAVATION (CLASS 3) →402.03 CONSTRUCTION current
- 17:30, 9 June 2020 diff hist -3 104 MAINTENANCE OF TRAFFIC →104.08.02 MATERIALS
- 17:24, 9 June 2020 diff hist 0 401 MAINTAINING EXISTING BRIDGE DECK DURING LIFE OF CONTRACT →401.04 MEASUREMENT AND PAYMENT current
- 16:05, 9 June 2020 diff hist +48 317 STORMWATER MANAGEMENT (SWM) FACILITY AS-BUILT CERTIFICATION →317.03 CONSTRUCTION
- 15:24, 9 June 2020 diff hist +37 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.03 CONSTRUCTION
- 15:18, 9 June 2020 diff hist +16 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.02 MATERIALS
- 14:34, 9 June 2020 diff hist +4 315 INFILTRATION TRENCHES →315.03 CONSTRUCTION current
- 14:31, 9 June 2020 diff hist 0 315 INFILTRATION TRENCHES →315.02 MATERIALS
- 14:30, 9 June 2020 diff hist +16 315 INFILTRATION TRENCHES →315.02 MATERIALS
- 14:23, 9 June 2020 diff hist 0 313 GABIONS →313.03 CONSTRUCTION current
- 14:22, 9 June 2020 diff hist +8 313 GABIONS →313.02 MATERIALS
- 14:18, 9 June 2020 diff hist 0 312 RIPRAP SLOPE AND CHANNEL PROTECTION →312.03 CONSTRUCTION current
- 14:17, 9 June 2020 diff hist +8 312 RIPRAP SLOPE AND CHANNEL PROTECTION →312.02 MATERIAL
- 14:12, 9 June 2020 diff hist 0 311 RIPRAP DITCHES →311.03 CONSTRUCTION current
- 14:10, 9 June 2020 diff hist +4 311 RIPRAP DITCHES →311.03 CONSTRUCTION
- 14:10, 9 June 2020 diff hist +12 311 RIPRAP DITCHES →311.02 MATERIALS
- 13:55, 9 June 2020 diff hist 0 309 CONCRETE DITCHES →309.04 MEASUREMENT AND PAYMENT current
- 13:51, 9 June 2020 diff hist +3 310 CONCRETE SLOPE AND CHANNEL PROTECTION →310.03 CONSTRUCTION current
- 13:49, 9 June 2020 diff hist +8 310 CONCRETE SLOPE AND CHANNEL PROTECTION →310.02 MATERIALS
- 13:31, 9 June 2020 diff hist 0 309 CONCRETE DITCHES →309.04 MEASUREMENT AND PAYMENT
- 13:29, 9 June 2020 diff hist +15 309 CONCRETE DITCHES →309.03 CONSTRUCTION
- 13:26, 9 June 2020 diff hist +8 309 CONCRETE DITCHES →309.02 MATERIALS
- 13:24, 9 June 2020 diff hist 0 308 EROSION AND SEDIMENT CONTROL →308.04 MEASUREMENT AND PAYMENT
- 12:34, 9 June 2020 diff hist +3 308 EROSION AND SEDIMENT CONTROL →308.04 MEASUREMENT AND PAYMENT
- 12:26, 9 June 2020 diff hist +72 308 EROSION AND SEDIMENT CONTROL →308.03 CONSTRUCTION
- 12:17, 9 June 2020 diff hist +32 308 EROSION AND SEDIMENT CONTROL →308.02 MATERIALS
- 20:06, 8 June 2020 diff hist +3 307 PREFABRICATED EDGE DRAINS →307.03 CONSTRUCTION current
- 20:05, 8 June 2020 diff hist 0 307 PREFABRICATED EDGE DRAINS →307.03 CONSTRUCTION
- 20:02, 8 June 2020 diff hist +20 305 MISCELLANEOUS STRUCTURES →305.03 CONSTRUCTION current
- 19:50, 8 June 2020 diff hist +24 307 PREFABRICATED EDGE DRAINS →307.02 MATERIALS
- 19:24, 8 June 2020 diff hist +6 306 UNDERDRAINS, SUBGRADE DRAINS, AND SPRING CONTROL →306.03 CONSTRUCTION current
- 19:22, 8 June 2020 diff hist 0 306 UNDERDRAINS, SUBGRADE DRAINS, AND SPRING CONTROL →306.03 CONSTRUCTION
- 19:21, 8 June 2020 diff hist +16 306 UNDERDRAINS, SUBGRADE DRAINS, AND SPRING CONTROL →306.02 MATERIALS
- 19:01, 8 June 2020 diff hist -3 305 MISCELLANEOUS STRUCTURES →305.03 CONSTRUCTION
- 18:58, 8 June 2020 diff hist +24 305 MISCELLANEOUS STRUCTURES →305.03 CONSTRUCTION
- 18:56, 8 June 2020 diff hist +7 305 MISCELLANEOUS STRUCTURES →305.02 MATERIALS
- 18:38, 8 June 2020 diff hist +6 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.04 MEASUREMENT AND PAYMENT current
- 18:34, 8 June 2020 diff hist -1 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.03 CONSTRUCTION
- 18:20, 8 June 2020 diff hist +12 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.03 CONSTRUCTION
- 18:15, 8 June 2020 diff hist 0 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.03 CONSTRUCTION
- 18:12, 8 June 2020 diff hist +3 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.03 CONSTRUCTION
- 18:11, 8 June 2020 diff hist +8 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.02 MATERIALS
- 17:29, 8 June 2020 diff hist 0 303 PIPE CULVERTS →303.04 MEASUREMENT AND PAYMENT
- 17:26, 8 June 2020 diff hist +3 303 PIPE CULVERTS →303.03 CONSTRUCTION
- 17:24, 8 June 2020 diff hist +27 303 PIPE CULVERTS →303.03 CONSTRUCTION
- 17:12, 8 June 2020 diff hist 0 303 PIPE CULVERTS →303.03 CONSTRUCTION
- 17:09, 8 June 2020 diff hist +8 303 PIPE CULVERTS →303.02 MATERIALS
- 15:09, 8 June 2020 diff hist +9 302 SELECTED BACKFILL →302.03 CONSTRUCTION current
- 14:57, 8 June 2020 diff hist +6 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION current
- 14:56, 8 June 2020 diff hist -6 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION
- 14:52, 8 June 2020 diff hist -1 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION
- 14:47, 8 June 2020 diff hist +1 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION
- 14:41, 8 June 2020 diff hist +3 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION
- 14:12, 8 June 2020 diff hist +4 211 GEOSYNTHETIC STABILIZED SUBGRADE USING GRADED AGGREGATE BASE →211.03 CONSTRUCTION current
- 14:10, 8 June 2020 diff hist +8 211 GEOSYNTHETIC STABILIZED SUBGRADE USING GRADED AGGREGATE BASE →211.02 MATERIALS
- 13:54, 8 June 2020 diff hist +9 208 SUBGRADE PREPARATION →208.03 CONSTRUCTION current
- 13:46, 8 June 2020 diff hist -5 208 SUBGRADE PREPARATION →208.03 CONSTRUCTION
- 13:41, 8 June 2020 diff hist -3 207 REMOVAL OF EXISTING MASONRY →207.03 CONSTRUCTION current
- 13:33, 8 June 2020 diff hist -8 205 TEST PIT EXCAVATION →205.04 MEASUREMENT AND PAYMENT current
- 13:24, 8 June 2020 diff hist +9 204 EMBANKMENT AND SUBGRADE →204.03 CONSTRUCTION current
- 13:19, 8 June 2020 diff hist -6 204 EMBANKMENT AND SUBGRADE →204.03 CONSTRUCTION