User contributions
Jump to navigation
Jump to search
- 12:22, 17 May 2021 diff hist 0 605 METAL TRAFFIC BARRIERS →605.04 MEASUREMENT AND PAYMENT current
- 18:01, 5 April 2021 diff hist +62 612 CABLE BARRIER SYSTEM →612.04 MEASUREMENT AND PAYMENT
- 17:58, 5 April 2021 diff hist +40 612 CABLE BARRIER SYSTEM →612.03 CONSTRUCTION
- 17:54, 5 April 2021 diff hist +58 612 CABLE BARRIER SYSTEM →612.02 MATERIALS
- 17:49, 5 April 2021 diff hist +79 612 CABLE BARRIER SYSTEM →612.02 MATERIALS
- 17:37, 5 April 2021 diff hist +20 606 PERMANENT TRAFFIC BARRIER END TREATMENTS →606.03 CONSTRUCTION
- 17:27, 5 April 2021 diff hist +45 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION current
- 17:22, 5 April 2021 diff hist +21 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 17:17, 5 April 2021 diff hist +3 605 METAL TRAFFIC BARRIERS →605.03 CONSTRUCTION
- 14:43, 5 April 2021 diff hist 0 612 CABLE BARRIER SYSTEM →603.04 MEASUREMENT AND PAYMENT
- 14:43, 5 April 2021 diff hist 0 612 CABLE BARRIER SYSTEM →605.03 CONSTRUCTION
- 14:26, 5 April 2021 diff hist +31 606 PERMANENT TRAFFIC BARRIER END TREATMENTS →606.03 CONSTRUCTION
- 14:18, 5 April 2021 diff hist -49 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 14:14, 5 April 2021 diff hist +49 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 13:46, 5 April 2021 diff hist +108 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 20:06, 1 April 2021 diff hist +9,717 612 CABLE BARRIER SYSTEM
- 13:00, 1 April 2021 diff hist 0 612 CABLE BARRIER SYSTEM →603.01 DESCRIPTION
- 13:00, 1 April 2021 diff hist +48 612 CABLE BARRIER SYSTEM
- 12:57, 1 April 2021 diff hist +122 N 612 CABLE BARRIER SYSTEM Created page with "======This is not a legal document. Please see disclaimer for more information.======"
- 12:50, 1 April 2021 diff hist +60 CATEGORY 600-SHOULDERS current
- 20:46, 31 March 2021 diff hist +1,539 917 MISCELLANEOUS PROTECTIVE COATINGS →917.03 FUSION BONDED POLYESTER POWDER current
- 13:17, 31 March 2021 diff hist -375 606 PERMANENT TRAFFIC BARRIER END TREATMENTS →606.04 MEASUREMENT AND PAYMENT
- 13:13, 31 March 2021 diff hist -1,084 606 PERMANENT TRAFFIC BARRIER END TREATMENTS →606.03 CONSTRUCTION
- 12:44, 31 March 2021 diff hist +524 465 MISCELLANEOUS COATINGS FOR METAL (STEEL) →465.03 CONSTRUCTION
- 20:04, 30 March 2021 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →510.03 CONSTRUCTION current
- 18:18, 5 October 2020 diff hist +1 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.04 MEASUREMENT AND PAYMENT current
- 17:49, 5 October 2020 diff hist -802 951 PAVEMENT MARKING MATERIALS →951.07 SNOWPLOWABLE RAISED AND NON-SNOWPLOWABLE RAISED PAVEMENT MARKERS current
- 14:26, 5 October 2020 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →505.04 MEASUREMENT AND PAYMENT
- 14:26, 5 October 2020 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →505.03 CONSTRUCTION
- 14:26, 5 October 2020 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.02 MATERIALS
- 14:26, 5 October 2020 diff hist 0 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.01 DESCRIPTION
- 14:22, 5 October 2020 diff hist +134 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS
- 14:16, 5 October 2020 diff hist +13,323 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.02 MATERIALS
- 13:29, 5 October 2020 diff hist +206 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.01 DESCRIPTION
- 13:13, 5 October 2020 diff hist +279 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →511.01 DESCRIPTION
- 13:12, 5 October 2020 diff hist +36 N 510 SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS Created page with "======'''511.01 DESCRIPTION'''======"
- 13:08, 5 October 2020 diff hist -23 CATEGORY 500 - PAVING →510 FILLING AND SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS
- 19:31, 2 October 2020 diff hist -84 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.04 MEASUREMENT AND PAYMENT
- 19:29, 2 October 2020 diff hist -532 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.03 CONSTRUCTION
- 15:03, 2 October 2020 diff hist +100 911 JOINTS →911.01 JOINT SEALER AND CRACK FILLER current
- 14:31, 2 October 2020 diff hist +13 507 SLURRY SEAL AND MICRO-SURFACING →507.04 MEASUREMENT AND PAYMENT. current
- 14:27, 2 October 2020 diff hist -129 507 SLURRY SEAL AND MICRO-SURFACING →507.03 CONSTRUCTION.
- 14:15, 2 October 2020 diff hist +63 505 ASPHALT PATCHES →505.04 MEASUREMENT AND PAYMENT current
- 14:14, 2 October 2020 diff hist +177 505 ASPHALT PATCHES →505.03 CONSTRUCTION
- 14:10, 2 October 2020 diff hist 0 505 ASPHALT PATCHES →505.02 MATERIALS
- 13:50, 2 October 2020 diff hist +36 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION current
- 13:47, 2 October 2020 diff hist 0 504 ASPHALT PAVEMENT →504.02 MATERIALS
- 13:46, 2 October 2020 diff hist 0 505 ASPHALT PATCHES →505.02 MATERIALS
- 13:45, 2 October 2020 diff hist 0 505 ASPHALT PATCHES →505.02 MATERIALS
- 20:08, 1 October 2020 diff hist +1,267 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.02 MATERIALS current
- 20:01, 1 October 2020 diff hist +2 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.02 MATERIALS
- 19:55, 1 October 2020 diff hist +74 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.02 MATERIALS
- 19:42, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.17.02 MATERIAL
- 19:41, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.14.02 MATERIALS
- 19:40, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.13.02 MATERIALS
- 19:39, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.12.02 MATERIALS
- 19:38, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.10.02 MATERIALS
- 19:37, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.09.02 MATERIALS
- 19:36, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.08.02 MATERIALS
- 19:35, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.06.02 MATERIALS.
- 19:34, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.05.02 MATERIALS
- 19:33, 1 October 2020 diff hist +65 104 MAINTENANCE OF TRAFFIC →104.04.02 MATERIALS
- 19:22, 1 October 2020 diff hist +64 104 MAINTENANCE OF TRAFFIC →104.23.02 MATERIALS
- 19:07, 1 October 2020 diff hist +399 104 MAINTENANCE OF TRAFFIC →104.23.02 MATERIALS
- 19:05, 1 October 2020 diff hist -587 104 MAINTENANCE OF TRAFFIC →104.23.01 DESCRIPTION
- 19:01, 1 October 2020 diff hist +85 104 MAINTENANCE OF TRAFFIC →104.17.02 MATERIAL
- 18:59, 1 October 2020 diff hist +136 104 MAINTENANCE OF TRAFFIC →104.14.02 MATERIALS
- 18:56, 1 October 2020 diff hist +90 104 MAINTENANCE OF TRAFFIC →104.13.02 MATERIALS
- 18:53, 1 October 2020 diff hist +136 104 MAINTENANCE OF TRAFFIC →104.12.02 MATERIALS
- 18:49, 1 October 2020 diff hist +84 104 MAINTENANCE OF TRAFFIC →104.10.02 MATERIALS
- 18:45, 1 October 2020 diff hist +120 104 MAINTENANCE OF TRAFFIC →104.09.02 MATERIALS
- 18:44, 1 October 2020 diff hist +111 104 MAINTENANCE OF TRAFFIC →104.08.02 MATERIALS
- 18:42, 1 October 2020 diff hist +145 104 MAINTENANCE OF TRAFFIC →104.06.02 MATERIALS.
- 18:41, 1 October 2020 diff hist +84 104 MAINTENANCE OF TRAFFIC →104.05.02 MATERIALS
- 18:39, 1 October 2020 diff hist +83 104 MAINTENANCE OF TRAFFIC →104.04.02 MATERIALS
- 18:26, 1 October 2020 diff hist +5 104 MAINTENANCE OF TRAFFIC →104.00 GENERAL
- 18:19, 1 October 2020 diff hist +265 TC - SECTION 2: BIDDING REQUIREMENTS AND CONDITIONS →TC-2.05 DELIVERY OF BIDS current
- 18:14, 1 October 2020 diff hist -38 TC - SECTION 2: BIDDING REQUIREMENTS AND CONDITIONS →TC-2.05 DELIVERY OF BIDS
- 18:05, 1 October 2020 diff hist -12 TC - SECTION 2: BIDDING REQUIREMENTS AND CONDITIONS →TC-2.03 PREPARATION OF BID
- 17:59, 1 October 2020 diff hist +125 GP - SECTION 8: PROSECUTION AND PROGRESS →GP-8.08 TERMINATION FOR DEFAULT-DAMAGES FOR DELAY-TIME EXTENSIONS current
- 13:45, 23 July 2020 diff hist +2,457 920 LANDSCAPING MATERIALS →920.06 SEED AND TURFGRASS SOD STANDARDS current
- 13:46, 21 July 2020 diff hist +278 920 LANDSCAPING MATERIALS →920.07 PLANT MATERIALS
- 13:37, 21 July 2020 diff hist +427 920 LANDSCAPING MATERIALS →920.06 SEED AND TURFGRASS SOD STANDARDS
- 13:20, 21 July 2020 diff hist +284 920 LANDSCAPING MATERIALS →920.06 SEED AND TURFGRASS SOD STANDARDS
- 13:08, 21 July 2020 diff hist +142 920 LANDSCAPING MATERIALS →920.06 SEED AND TURFGRASS SOD STANDARDS
- 12:55, 21 July 2020 diff hist +355 920 LANDSCAPING MATERIALS →920.05 SOIL STABILIZATION MATTING
- 12:43, 21 July 2020 diff hist +213 920 LANDSCAPING MATERIALS →920.03 FERTILIZERS
- 19:21, 20 July 2020 diff hist +31 951 PAVEMENT MARKING MATERIALS →951.05 THERMOPLASTIC PAVEMENT MARKINGS - 40-mil HIGH BINDER
- 19:10, 20 July 2020 diff hist +32 951 PAVEMENT MARKING MATERIALS →951.04 THERMOPLASTIC PAVEMENT MARKINGS
- 18:23, 20 July 2020 diff hist +58 950 TRAFFIC MATERIALS →950.15 TRAFFIC SIGNAL HEADS current
- 20:13, 17 July 2020 diff hist +15 926 FOAMED ASPHALT STABILIZED BASE COURSE MIX →926.01 MIX REQUIREMENTS current
- 19:51, 17 July 2020 diff hist +64 925 DETECTABLE WARNING SURFACES →925.07 PHYSICAL PROPERTIES current
- 19:35, 17 July 2020 diff hist +65 922 PREFABRICATED EDGE DRAINS →922.02 PREFABRICATED EDGE DRAINS current
- 19:20, 17 July 2020 diff hist +253 920 LANDSCAPING MATERIALS →920.04 MULCHES
- 19:09, 17 July 2020 diff hist +90 920 LANDSCAPING MATERIALS →920.02 SOIL AMENDMENTS
- 19:03, 17 July 2020 diff hist +790 920 LANDSCAPING MATERIALS →920.01 SOILS
- 18:44, 17 July 2020 diff hist +71 920 LANDSCAPING MATERIALS →920.01 SOILS
- 18:43, 17 July 2020 diff hist +71 920 LANDSCAPING MATERIALS →920.01 SOILS
- 18:38, 17 July 2020 diff hist +71 920 LANDSCAPING MATERIALS →920.01 SOILS
- 19:58, 16 July 2020 diff hist +74 919 GEOTEXTILES →919 GEOTEXTILES current
- 19:39, 16 July 2020 diff hist +702 911 JOINTS →911.11 DRAINAGE TROUGHS
- 19:22, 16 July 2020 diff hist +108 911 JOINTS →911.09 ASPHALT SEALER FOR CONCRETE PIPE
- 19:21, 16 July 2020 diff hist +162 911 JOINTS →911.08 WATER STOPS
- 19:16, 16 July 2020 diff hist +1,045 911 JOINTS →911.06 SEALER FOR LOOP DETECTOR
- 18:56, 16 July 2020 diff hist +432 911 JOINTS →911.05 NEOPRENE STRIP SEALS
- 18:41, 16 July 2020 diff hist +426 911 JOINTS →911.01 JOINT SEALER AND CRACK FILLER
- 18:21, 16 July 2020 diff hist +324 907 PILES AND PILING →907.01 TIMBER PILING current
- 18:10, 16 July 2020 diff hist +864 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.05 GAP-GRADED STONE MATRIX ASPHALT (GGSMA) current
- 18:04, 16 July 2020 diff hist +162 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.05 GAP-GRADED STONE MATRIX ASPHALT (GGSMA)
- 18:00, 16 July 2020 diff hist +648 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.04 ASPHALT MIXES
- 17:52, 16 July 2020 diff hist +135 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.04 ASPHALT MIXES
- 17:42, 16 July 2020 diff hist +270 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.04 ASPHALT MIXES
- 12:35, 14 July 2020 diff hist +38 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 12:23, 14 July 2020 diff hist +87 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.17 SELF CONSOLIDATING CONCRETE (SCC)
- 20:08, 13 July 2020 diff hist +2 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 12:23, 9 July 2020 diff hist +35 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 20:00, 8 July 2020 diff hist +44 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:47, 8 July 2020 diff hist +729 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:39, 8 July 2020 diff hist +1,755 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:23, 8 July 2020 diff hist -122 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:20, 8 July 2020 diff hist +1 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:16, 8 July 2020 diff hist +77 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 18:08, 8 July 2020 diff hist +44 902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS →902.13 LATEX MODIFIED CONCRETE
- 17:26, 8 July 2020 diff hist +108 711 ANNUALS AND BULBS INSTALLATION AND ESTABLISHMENT →711.03 CONSTRUCTION current
- 17:22, 8 July 2020 diff hist +27 711 ANNUALS AND BULBS INSTALLATION AND ESTABLISHMENT →711.03 CONSTRUCTION
- 13:27, 6 July 2020 diff hist +641 711 ANNUALS AND BULBS INSTALLATION AND ESTABLISHMENT →711.04 MEASUREMENT AND PAYMENT
- 12:51, 6 July 2020 diff hist +365 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.04 MEASUREMENT AND PAYMENT current
- 12:28, 6 July 2020 diff hist +45 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 12:22, 6 July 2020 diff hist +44 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 20:07, 2 July 2020 diff hist +18 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 19:21, 2 July 2020 diff hist +1,071 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 18:49, 2 July 2020 diff hist +27 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 18:31, 2 July 2020 diff hist +20 710 TREE, SHRUB AND PERENNIAL INSTALLATION AND ESTABLISHMENT →710.03 CONSTRUCTION
- 17:26, 2 July 2020 diff hist +78 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.04 MEASUREMENT AND PAYMENT current
- 17:14, 2 July 2020 diff hist +153 506 GAP-GRADED STONE MATRIX ASPHALT →506.04 MEASUREMENT AND PAYMENT. current
- 17:08, 2 July 2020 diff hist +178 504 ASPHALT PAVEMENT →504.04 MEASUREMENT AND PAYMENT
- 16:55, 2 July 2020 diff hist +20 111 SAMPLING DEVICES, TESTING AND SAFETY EQUIPMENT →111.03 CONSTRUCTION current
- 16:51, 2 July 2020 diff hist +42 104 MAINTENANCE OF TRAFFIC →104.07.03 CONSTRUCTION
- 15:57, 2 July 2020 diff hist +21 470 UTILITIES ON STRUCTURES →470.02 MATERIALS current
- 15:29, 2 July 2020 diff hist -21 470 UTILITIES ON STRUCTURES →470.02 MATERIALS
- 19:54, 1 July 2020 diff hist +6 111 SAMPLING DEVICES, TESTING AND SAFETY EQUIPMENT →111.03 CONSTRUCTION
- 19:39, 1 July 2020 diff hist +6 104 MAINTENANCE OF TRAFFIC →104.07.03 CONSTRUCTION
- 17:28, 22 June 2020 diff hist -4 915 PRODUCTION PLANTS →915.05 CERTIFIED PRECAST CONCRETE PLANTS
- 17:06, 22 June 2020 diff hist -1 915 PRODUCTION PLANTS →915.05 CERTIFIED PRECAST CONCRETE PLANTS
- 15:39, 22 June 2020 diff hist -15 915 PRODUCTION PLANTS →915.03 PORTLAND CEMENT CONCRETE PLANTS
- 15:31, 22 June 2020 diff hist +4 915 PRODUCTION PLANTS →915.03 PORTLAND CEMENT CONCRETE PLANTS
- 11:49, 18 June 2020 diff hist -48 308 EROSION AND SEDIMENT CONTROL →308.03 CONSTRUCTION
- 11:43, 18 June 2020 diff hist 0 714 TREE FELLING AND STUMP REMOVAL →714.03 CONSTRUCTION current
- 11:41, 18 June 2020 diff hist 0 712 TREE BRANCH PRUNING →712.03 CONSTRUCTION current
- 13:25, 10 June 2020 diff hist +1 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION current
- 13:14, 10 June 2020 diff hist 0 521 CONTINUOUSLY REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT →521.03 CONSTRUCTION current
- 13:12, 10 June 2020 diff hist 0 521 CONTINUOUSLY REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT →521.01 DESCRIPTION
- 13:10, 10 June 2020 diff hist 0 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.04 MEASUREMENT AND PAYMENT
- 13:09, 10 June 2020 diff hist +24 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.03 CONSTRUCTION
- 13:03, 10 June 2020 diff hist +24 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.02 MATERIALS
- 13:02, 10 June 2020 diff hist 0 520 PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS →520.01 DESCRIPTION
- 12:56, 10 June 2020 diff hist -2 513 FOAMED ASPHALT STABILIZED BASE COURSE →513.03 CONSTRUCTION current
- 12:37, 10 June 2020 diff hist +8 512 SURFACE ABRASION →512.03 CONSTRUCTION current
- 12:27, 10 June 2020 diff hist -1 511 OPEN GRADED FRICTION COURSE →511.03 CONSTRUCTION current
- 12:26, 10 June 2020 diff hist +50 511 OPEN GRADED FRICTION COURSE →511.03 CONSTRUCTION
- 12:22, 10 June 2020 diff hist +43 510 FILLING AND SEALING CRACKS AND JOINTS IN ASPHALT PAVEMENTS →510.03 CONSTRUCTION current
- 12:06, 10 June 2020 diff hist +12 509 DIAMOND GRINDING →509.03 CONSTRUCTION current
- 20:06, 9 June 2020 diff hist +24 508 MILLING ASPHALT PAVEMENT →508.04 MEASUREMENT AND PAYMENT current
- 20:04, 9 June 2020 diff hist +1 508 MILLING ASPHALT PAVEMENT →508.03 CONSTRUCTION
- 20:04, 9 June 2020 diff hist +34 508 MILLING ASPHALT PAVEMENT →508.03 CONSTRUCTION
- 19:55, 9 June 2020 diff hist +21 507 SLURRY SEAL AND MICRO-SURFACING →507.04 MEASUREMENT AND PAYMENT.
- 19:51, 9 June 2020 diff hist +69 507 SLURRY SEAL AND MICRO-SURFACING →507.03 CONSTRUCTION.
- 19:38, 9 June 2020 diff hist +8 507 SLURRY SEAL AND MICRO-SURFACING →507.02 MATERIALS.
- 19:33, 9 June 2020 diff hist +46 506 GAP-GRADED STONE MATRIX ASPHALT →506.03 CONSTRUCTION.
- 19:28, 9 June 2020 diff hist +8 506 GAP-GRADED STONE MATRIX ASPHALT →506.02 MATERIALS.
- 19:25, 9 June 2020 diff hist +6 505 ASPHALT PATCHES →505.03 CONSTRUCTION
- 19:19, 9 June 2020 diff hist +24 505 ASPHALT PATCHES →505.02 MATERIALS
- 19:11, 9 June 2020 diff hist +13 504 ASPHALT PAVEMENT →504.04 MEASUREMENT AND PAYMENT
- 19:08, 9 June 2020 diff hist +15 504 ASPHALT PAVEMENT →504.04 MEASUREMENT AND PAYMENT
- 19:05, 9 June 2020 diff hist +9 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION
- 18:58, 9 June 2020 diff hist +50 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION
- 18:51, 9 June 2020 diff hist +28 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION
- 18:49, 9 June 2020 diff hist +61 504 ASPHALT PAVEMENT →504.03 CONSTRUCTION
- 18:41, 9 June 2020 diff hist +8 504 ASPHALT PAVEMENT →504.02 MATERIALS
- 18:35, 9 June 2020 diff hist +1 503 CHIP SEAL SURFACE TREATMENT →503.03 CONSTRUCTION. current
- 18:31, 9 June 2020 diff hist +1 502 SOIL-CEMENT BASE COURSE →502.03 CONSTRUCTION.
- 18:30, 9 June 2020 diff hist +9 502 SOIL-CEMENT BASE COURSE →502.03 CONSTRUCTION.
- 18:27, 9 June 2020 diff hist +8 502 SOIL-CEMENT BASE COURSE →502.02 MATERIALS.
- 18:27, 9 June 2020 diff hist 0 502 SOIL-CEMENT BASE COURSE →502.01 DESCRIPTION.
- 18:22, 9 June 2020 diff hist 0 501 AGGREGATE BASE COURSES →501.04 MEASUREMENT AND PAYMENT.
- 18:20, 9 June 2020 diff hist +36 501 AGGREGATE BASE COURSES →501.03 CONSTRUCTION.
- 18:06, 9 June 2020 diff hist 0 501 AGGREGATE BASE COURSES →501.01 DESCRIPTION.
- 18:01, 9 June 2020 diff hist +18 405 REMOVAL OF EXISTING STRUCTURES →405.03 CONSTRUCTION current
- 17:49, 9 June 2020 diff hist +4 404 PROTECTION OF EXISTING STRUCTURES →404.03 CONSTRUCTION current
- 17:42, 9 June 2020 diff hist +17 402 STRUCTURE EXCAVATION (CLASS 3) →402.03 CONSTRUCTION current
- 17:30, 9 June 2020 diff hist -3 104 MAINTENANCE OF TRAFFIC →104.08.02 MATERIALS
- 17:24, 9 June 2020 diff hist 0 401 MAINTAINING EXISTING BRIDGE DECK DURING LIFE OF CONTRACT →401.04 MEASUREMENT AND PAYMENT current
- 16:05, 9 June 2020 diff hist +48 317 STORMWATER MANAGEMENT (SWM) FACILITY AS-BUILT CERTIFICATION →317.03 CONSTRUCTION
- 15:24, 9 June 2020 diff hist +37 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.03 CONSTRUCTION
- 15:18, 9 June 2020 diff hist +16 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES →316.02 MATERIALS
- 14:34, 9 June 2020 diff hist +4 315 INFILTRATION TRENCHES →315.03 CONSTRUCTION current
- 14:31, 9 June 2020 diff hist 0 315 INFILTRATION TRENCHES →315.02 MATERIALS
- 14:30, 9 June 2020 diff hist +16 315 INFILTRATION TRENCHES →315.02 MATERIALS
- 14:23, 9 June 2020 diff hist 0 313 GABIONS →313.03 CONSTRUCTION current
- 14:22, 9 June 2020 diff hist +8 313 GABIONS →313.02 MATERIALS
- 14:18, 9 June 2020 diff hist 0 312 RIPRAP SLOPE AND CHANNEL PROTECTION →312.03 CONSTRUCTION current
- 14:17, 9 June 2020 diff hist +8 312 RIPRAP SLOPE AND CHANNEL PROTECTION →312.02 MATERIAL
- 14:12, 9 June 2020 diff hist 0 311 RIPRAP DITCHES →311.03 CONSTRUCTION current
- 14:10, 9 June 2020 diff hist +4 311 RIPRAP DITCHES →311.03 CONSTRUCTION
- 14:10, 9 June 2020 diff hist +12 311 RIPRAP DITCHES →311.02 MATERIALS
- 13:55, 9 June 2020 diff hist 0 309 CONCRETE DITCHES →309.04 MEASUREMENT AND PAYMENT current
- 13:51, 9 June 2020 diff hist +3 310 CONCRETE SLOPE AND CHANNEL PROTECTION →310.03 CONSTRUCTION current
- 13:49, 9 June 2020 diff hist +8 310 CONCRETE SLOPE AND CHANNEL PROTECTION →310.02 MATERIALS
- 13:31, 9 June 2020 diff hist 0 309 CONCRETE DITCHES →309.04 MEASUREMENT AND PAYMENT
- 13:29, 9 June 2020 diff hist +15 309 CONCRETE DITCHES →309.03 CONSTRUCTION
- 13:26, 9 June 2020 diff hist +8 309 CONCRETE DITCHES →309.02 MATERIALS
- 13:24, 9 June 2020 diff hist 0 308 EROSION AND SEDIMENT CONTROL →308.04 MEASUREMENT AND PAYMENT
- 12:34, 9 June 2020 diff hist +3 308 EROSION AND SEDIMENT CONTROL →308.04 MEASUREMENT AND PAYMENT
- 12:26, 9 June 2020 diff hist +72 308 EROSION AND SEDIMENT CONTROL →308.03 CONSTRUCTION
- 12:17, 9 June 2020 diff hist +32 308 EROSION AND SEDIMENT CONTROL →308.02 MATERIALS
- 20:06, 8 June 2020 diff hist +3 307 PREFABRICATED EDGE DRAINS →307.03 CONSTRUCTION current
- 20:05, 8 June 2020 diff hist 0 307 PREFABRICATED EDGE DRAINS →307.03 CONSTRUCTION
- 20:02, 8 June 2020 diff hist +20 305 MISCELLANEOUS STRUCTURES →305.03 CONSTRUCTION current
- 19:50, 8 June 2020 diff hist +24 307 PREFABRICATED EDGE DRAINS →307.02 MATERIALS
- 19:24, 8 June 2020 diff hist +6 306 UNDERDRAINS, SUBGRADE DRAINS, AND SPRING CONTROL →306.03 CONSTRUCTION current
- 19:22, 8 June 2020 diff hist 0 306 UNDERDRAINS, SUBGRADE DRAINS, AND SPRING CONTROL →306.03 CONSTRUCTION
- 19:21, 8 June 2020 diff hist +16 306 UNDERDRAINS, SUBGRADE DRAINS, AND SPRING CONTROL →306.02 MATERIALS
- 19:01, 8 June 2020 diff hist -3 305 MISCELLANEOUS STRUCTURES →305.03 CONSTRUCTION
- 18:58, 8 June 2020 diff hist +24 305 MISCELLANEOUS STRUCTURES →305.03 CONSTRUCTION
- 18:56, 8 June 2020 diff hist +7 305 MISCELLANEOUS STRUCTURES →305.02 MATERIALS
- 18:38, 8 June 2020 diff hist +6 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.04 MEASUREMENT AND PAYMENT current
- 18:34, 8 June 2020 diff hist -1 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.03 CONSTRUCTION
- 18:20, 8 June 2020 diff hist +12 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.03 CONSTRUCTION
- 18:15, 8 June 2020 diff hist 0 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.03 CONSTRUCTION
- 18:12, 8 June 2020 diff hist +3 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.03 CONSTRUCTION
- 18:11, 8 June 2020 diff hist +8 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS →304.02 MATERIALS
- 17:29, 8 June 2020 diff hist 0 303 PIPE CULVERTS →303.04 MEASUREMENT AND PAYMENT
- 17:26, 8 June 2020 diff hist +3 303 PIPE CULVERTS →303.03 CONSTRUCTION
- 17:24, 8 June 2020 diff hist +27 303 PIPE CULVERTS →303.03 CONSTRUCTION
- 17:12, 8 June 2020 diff hist 0 303 PIPE CULVERTS →303.03 CONSTRUCTION
- 17:09, 8 June 2020 diff hist +8 303 PIPE CULVERTS →303.02 MATERIALS
- 15:09, 8 June 2020 diff hist +9 302 SELECTED BACKFILL →302.03 CONSTRUCTION current
- 14:57, 8 June 2020 diff hist +6 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION current
- 14:56, 8 June 2020 diff hist -6 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION
- 14:52, 8 June 2020 diff hist -1 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION
- 14:47, 8 June 2020 diff hist +1 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION
- 14:41, 8 June 2020 diff hist +3 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION →301.03 CONSTRUCTION
- 14:12, 8 June 2020 diff hist +4 211 GEOSYNTHETIC STABILIZED SUBGRADE USING GRADED AGGREGATE BASE →211.03 CONSTRUCTION current
- 14:10, 8 June 2020 diff hist +8 211 GEOSYNTHETIC STABILIZED SUBGRADE USING GRADED AGGREGATE BASE →211.02 MATERIALS
- 13:54, 8 June 2020 diff hist +9 208 SUBGRADE PREPARATION →208.03 CONSTRUCTION current
- 13:46, 8 June 2020 diff hist -5 208 SUBGRADE PREPARATION →208.03 CONSTRUCTION
- 13:41, 8 June 2020 diff hist -3 207 REMOVAL OF EXISTING MASONRY →207.03 CONSTRUCTION current
- 13:33, 8 June 2020 diff hist -8 205 TEST PIT EXCAVATION →205.04 MEASUREMENT AND PAYMENT current
- 13:24, 8 June 2020 diff hist +9 204 EMBANKMENT AND SUBGRADE →204.03 CONSTRUCTION current
- 13:19, 8 June 2020 diff hist -6 204 EMBANKMENT AND SUBGRADE →204.03 CONSTRUCTION
- 13:15, 8 June 2020 diff hist +13 204 EMBANKMENT AND SUBGRADE →204.03 CONSTRUCTION
- 13:07, 8 June 2020 diff hist 0 203 BORROW EXCAVATION →203.04 MEASUREMENT AND PAYMENT
- 12:44, 8 June 2020 diff hist -4 201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2) →201.04 MEASUREMENT AND PAYMENT
- 12:43, 8 June 2020 diff hist 0 201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2) →201.04 MEASUREMENT AND PAYMENT
- 12:43, 8 June 2020 diff hist +4 201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2) →201.03 CONSTRUCTION
- 12:40, 8 June 2020 diff hist +8 201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2) →201.01 DESCRIPTION
- 20:07, 5 June 2020 diff hist +33 111 SAMPLING DEVICES, TESTING AND SAFETY EQUIPMENT →111.03 CONSTRUCTION
- 19:59, 5 June 2020 diff hist +2 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 19:48, 5 June 2020 diff hist 0 109 PROJECT SCHEDULE →109.04 MEASUREMENT AND PAYMENT
- 19:46, 5 June 2020 diff hist -45 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 19:19, 5 June 2020 diff hist +3 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 19:17, 5 June 2020 diff hist +3 109 PROJECT SCHEDULE →109.01 DESCRIPTION
- 19:15, 5 June 2020 diff hist -3 109 PROJECT SCHEDULE →109.01 DESCRIPTION
- 18:50, 5 June 2020 diff hist -10 107 CONSTRUCTION STAKEOUT →107.03 CONSTRUCTION current
- 18:41, 5 June 2020 diff hist 0 106 ASPHALT MIXES FOR MAINTENANCE OF TRAFFIC →106.04 MEASUREMENT AND PAYMENT current
- 18:39, 5 June 2020 diff hist +8 106 ASPHALT MIXES FOR MAINTENANCE OF TRAFFIC →106.02 MATERIALS
- 18:32, 5 June 2020 diff hist +8 105 AGGREGATE FOR MAINTENANCE OF TRAFFIC →105.04 MEASUREMENT AND PAYMENT current
- 18:27, 5 June 2020 diff hist +4 104 MAINTENANCE OF TRAFFIC →104.31.03 CONSTRUCTION
- 18:22, 5 June 2020 diff hist -3 104 MAINTENANCE OF TRAFFIC →104.30.03 CONSTRUCTION
- 18:14, 5 June 2020 diff hist +8 104 MAINTENANCE OF TRAFFIC →104.30.03 CONSTRUCTION
- 17:59, 5 June 2020 diff hist +39 104 MAINTENANCE OF TRAFFIC →104.29.03 CONSTRUCTION
- 17:45, 5 June 2020 diff hist +24 104 MAINTENANCE OF TRAFFIC →104.28.02 MATERIALS
- 17:30, 5 June 2020 diff hist +3 104 MAINTENANCE OF TRAFFIC →104.26.03 CONSTRUCTION
- 17:25, 5 June 2020 diff hist -2 104 MAINTENANCE OF TRAFFIC →104.23.01 DESCRIPTION
- 17:13, 5 June 2020 diff hist +20 104 MAINTENANCE OF TRAFFIC →104.19.03 CONSTRUCTION
- 17:10, 5 June 2020 diff hist +20 104 MAINTENANCE OF TRAFFIC →104.19.03 CONSTRUCTION
- 16:54, 5 June 2020 diff hist 0 104 MAINTENANCE OF TRAFFIC →104.16.04 MEASUREMENT AND PAYMENT
- 16:53, 5 June 2020 diff hist -3 104 MAINTENANCE OF TRAFFIC →104.16.02 MATERIAL
- 15:51, 5 June 2020 diff hist +4 104 MAINTENANCE OF TRAFFIC →104.15.02 MATERIALS
- 15:35, 5 June 2020 diff hist +3 104 MAINTENANCE OF TRAFFIC →104.14.03 CONSTRUCTION
- 15:34, 5 June 2020 diff hist +4 104 MAINTENANCE OF TRAFFIC →104.14.02 MATERIALS
- 15:28, 5 June 2020 diff hist -1 104 MAINTENANCE OF TRAFFIC →104.12.03 CONSTRUCTION
- 15:26, 5 June 2020 diff hist +1 104 MAINTENANCE OF TRAFFIC →104.12.03 CONSTRUCTION
- 15:08, 5 June 2020 diff hist 0 104 MAINTENANCE OF TRAFFIC →104.08.04 MEASUREMENT AND PAYMENT
- 14:44, 5 June 2020 diff hist +20 104 MAINTENANCE OF TRAFFIC →104.08.03 CONSTRUCTION
- 14:34, 5 June 2020 diff hist -1 104 MAINTENANCE OF TRAFFIC →104.07.03 CONSTRUCTION
- 14:33, 5 June 2020 diff hist -3 104 MAINTENANCE OF TRAFFIC →104.07.03 CONSTRUCTION
- 14:33, 5 June 2020 diff hist +7 104 MAINTENANCE OF TRAFFIC →104.07.03 CONSTRUCTION
- 14:15, 5 June 2020 diff hist +8 104 MAINTENANCE OF TRAFFIC →104.05.02 MATERIALS
- 14:09, 5 June 2020 diff hist +4 104 MAINTENANCE OF TRAFFIC →104.02.03 CONSTRUCTION
- 14:06, 5 June 2020 diff hist -21 104 MAINTENANCE OF TRAFFIC →104.02.02 MATERIALS
- 14:05, 5 June 2020 diff hist +8 104 MAINTENANCE OF TRAFFIC →104.02.02 MATERIALS
- 14:03, 5 June 2020 diff hist +12 104 MAINTENANCE OF TRAFFIC →104.02.02 MATERIALS
- 14:01, 5 June 2020 diff hist 0 104 MAINTENANCE OF TRAFFIC →104.02.02 MATERIALS
- 13:58, 5 June 2020 diff hist +9 104 MAINTENANCE OF TRAFFIC →104.02.02 MATERIALS
- 13:47, 5 June 2020 diff hist -1 104 MAINTENANCE OF TRAFFIC →104.01.01 DESCRIPTION
- 13:46, 5 June 2020 diff hist -4 104 MAINTENANCE OF TRAFFIC →104.01.01 DESCRIPTION
- 13:43, 5 June 2020 diff hist +12 104 MAINTENANCE OF TRAFFIC →104.01.01 DESCRIPTION
- 13:28, 5 June 2020 diff hist +23 103 ENGINEERS OFFICE →103.03 CONSTRUCTION current
- 13:22, 5 June 2020 diff hist +22 103 ENGINEERS OFFICE →103.03 CONSTRUCTION
- 13:05, 5 June 2020 diff hist -1 101 CLEARING AND GRUBBING →101.03 CONSTRUCTION current
- 13:04, 5 June 2020 diff hist -2 101 CLEARING AND GRUBBING →101.01 DESCRIPTION
- 19:04, 22 May 2020 diff hist -104 921 MISCELLANEOUS →921.04 EPOXY ADHESIVES
- 19:04, 22 May 2020 diff hist +104 921 MISCELLANEOUS →921.04 EPOXY ADHESIVES
- 15:41, 7 April 2020 diff hist +2 951 PAVEMENT MARKING MATERIALS →951.06 PREFORMED THERMOPLASTIC PAVEMENT MARKINGS
- 15:38, 7 April 2020 diff hist +1 951 PAVEMENT MARKING MATERIALS →951.09 GLASS BEADS.
- 14:56, 7 April 2020 diff hist +1 911 JOINTS →911.01 JOINT SEALER AND CRACK FILLER
- 14:11, 7 April 2020 diff hist -2 915 PRODUCTION PLANTS →915.04 BASE COURSE PLANTS
- 14:10, 7 April 2020 diff hist +2 915 PRODUCTION PLANTS →915.04 BASE COURSE PLANTS
- 13:46, 7 April 2020 diff hist +2 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.04 ASPHALT MIXES
- 13:42, 7 April 2020 diff hist +1 904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPHALT MIXES →904.04 ASPHALT MIXES
- 13:49, 28 February 2020 diff hist -1 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE →528.03 CONSTRUCTION current
- 20:09, 27 February 2020 diff hist +68 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.04 MEASUREMENT AND PAYMENT
- 20:00, 27 February 2020 diff hist -7 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 19:58, 27 February 2020 diff hist +1 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 19:44, 27 February 2020 diff hist +2 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.02 MATERIALS
- 19:10, 27 February 2020 diff hist +9 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 16:55, 27 February 2020 diff hist 0 911 JOINTS →911.06 SEALER FOR LOOP DETECTOR
- 16:53, 27 February 2020 diff hist +68 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE →528.04 MEASUREMENT AND PAYMENT
- 16:20, 27 February 2020 diff hist -1 911 JOINTS →911.06 SEALER FOR LOOP DETECTOR
- 16:16, 27 February 2020 diff hist +5 911 JOINTS →911.06 SEALER FOR LOOP DETECTOR
- 15:52, 27 February 2020 diff hist +99 911 JOINTS →911.06 SEALER FOR LOOP DETECTOR
- 14:44, 27 February 2020 diff hist -1 554 THERMOPLASTIC PAVEMENT MARKINGS →554.04 MEASUREMENT AND PAYMENT
- 14:43, 27 February 2020 diff hist -65 554 THERMOPLASTIC PAVEMENT MARKINGS →554.04 MEASUREMENT AND PAYMENT
- 14:39, 27 February 2020 diff hist -8 554 THERMOPLASTIC PAVEMENT MARKINGS →554.04 MEASUREMENT AND PAYMENT
- 14:21, 27 February 2020 diff hist +1 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE →528.03 CONSTRUCTION
- 13:32, 27 February 2020 diff hist +1,888 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE
- 13:05, 27 February 2020 diff hist +510 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE →528.03 CONSTRUCTION
- 12:40, 27 February 2020 diff hist +5,179 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE →528.03 CONSTRUCTION
- 12:17, 27 February 2020 diff hist -1 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE →528.03 CONSTRUCTION
- 12:13, 27 February 2020 diff hist +1 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE →528.02 MATERIALS
- 20:31, 26 February 2020 diff hist +1,517 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE
- 20:24, 26 February 2020 diff hist +1,259 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE
- 19:59, 26 February 2020 diff hist +122 N 528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE Created page with "======This is not a legal document. Please see disclaimer for more information.======"
- 19:55, 26 February 2020 diff hist +1 CATEGORY 500 - PAVING →528 RESURFACING ASPHALT PAVEMENT USING PORTLAND CEMENT CONCRETE
- 19:55, 26 February 2020 diff hist +1 CATEGORY 500 - PAVING →522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS
- 19:54, 26 February 2020 diff hist +73 CATEGORY 500 - PAVING
- 19:34, 26 February 2020 diff hist -3 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.04 MEASUREMENT AND PAYMENT
- 19:28, 26 February 2020 diff hist -51 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 19:24, 26 February 2020 diff hist -18 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 19:22, 26 February 2020 diff hist -51 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 19:20, 26 February 2020 diff hist +1 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 19:13, 26 February 2020 diff hist -217 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 17:04, 26 February 2020 diff hist +1,113 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.03 CONSTRUCTION
- 16:17, 26 February 2020 diff hist +8 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.02 MATERIALS
- 16:06, 26 February 2020 diff hist +227 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.02 MATERIALS
- 15:44, 26 February 2020 diff hist +7 522 PORTLAND CEMENT CONCRETE PAVEMENT REPAIRS →522.01 DESCRIPTION
- 19:10, 18 February 2020 diff hist -7 440 PRESTRESSED CONCRETE BEAMS AND SLAB PANELS →440.03 CONSTRUCTION
- 14:28, 27 January 2020 diff hist 0 905 PIPE →905.03 CERTIFIED CORRUGATED POLYETHYLENE PIPE PLANTS
- 14:26, 27 January 2020 diff hist -1,728 905 PIPE →905.03 CERTIFIED CORRUGATED POLYETHYLENE PIPE PLANTS
- 13:59, 27 January 2020 diff hist +29 905 PIPE →905.03 CERTIFIED CORRUGATED POLYETHYLENE PIPE PLANTS
- 13:54, 27 January 2020 diff hist +803 905 PIPE →905.03 CERTIFIED CORRUGATED POLYETHYLENE PIPE PLANTS
- 13:31, 27 January 2020 diff hist -1 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.03 CONSTRUCTION
- 13:30, 27 January 2020 diff hist -2 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.03 CONSTRUCTION
- 13:30, 27 January 2020 diff hist +4 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.03 CONSTRUCTION
- 13:29, 27 January 2020 diff hist +32 557 SNOWPLOWABLE RAISED PAVEMENT MARKERS →557.03 CONSTRUCTION
- 13:16, 27 January 2020 diff hist +141 440 PRESTRESSED CONCRETE BEAMS AND SLAB PANELS
- 19:11, 3 October 2019 diff hist -2 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.03 CONSTRUCTION
- 19:08, 3 October 2019 diff hist +4 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.03 CONSTRUCTION
- 18:59, 3 October 2019 diff hist +21 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.03 CONSTRUCTION
- 18:42, 3 October 2019 diff hist -4 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:42, 3 October 2019 diff hist +4 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:41, 3 October 2019 diff hist 0 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:41, 3 October 2019 diff hist +1 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:39, 3 October 2019 diff hist +2,518 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.03 CONSTRUCTION
- 18:27, 3 October 2019 diff hist +579 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.03 CONSTRUCTION
- 18:22, 3 October 2019 diff hist -5 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:21, 3 October 2019 diff hist +5 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:21, 3 October 2019 diff hist -45 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:19, 3 October 2019 diff hist +15 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:19, 3 October 2019 diff hist +15 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:19, 3 October 2019 diff hist +15 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:18, 3 October 2019 diff hist +1 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.03 CONSTRUCTION
- 18:18, 3 October 2019 diff hist -4 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.03 CONSTRUCTION
- 18:17, 3 October 2019 diff hist +317 525 PORTLAND CEMENT CONCRETE SPALL REPAIR
- 18:12, 3 October 2019 diff hist +3 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 18:11, 3 October 2019 diff hist +270 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 17:59, 3 October 2019 diff hist -5 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 17:58, 3 October 2019 diff hist -2 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 17:58, 3 October 2019 diff hist +7 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 17:57, 3 October 2019 diff hist +49 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 17:54, 3 October 2019 diff hist -1 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 17:52, 3 October 2019 diff hist -4 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 17:50, 3 October 2019 diff hist -50 525 PORTLAND CEMENT CONCRETE SPALL REPAIR →525.02 MATERIALS
- 17:50, 3 October 2019 diff hist +216 525 PORTLAND CEMENT CONCRETE SPALL REPAIR
- 17:42, 3 October 2019 diff hist +385 525 PORTLAND CEMENT CONCRETE SPALL REPAIR
- 17:34, 3 October 2019 diff hist +132 N 525 PORTLAND CEMENT CONCRETE SPALL REPAIR Created page with "__NOTOC__ ======This is not a legal document. Please see disclaimer for more information.======"
- 17:34, 3 October 2019 diff hist -124 CATEGORY 500 - PAVING →525 PORTLAND CEMENT CONCRETE SPALL REPAIR
- 17:34, 3 October 2019 diff hist +125 CATEGORY 500 - PAVING →525 PORTLAND CEMENT CONCRETE SPALL REPAIR
- 17:27, 3 October 2019 diff hist +52 CATEGORY 500 - PAVING
- 17:23, 3 October 2019 diff hist +128 918 TRAFFIC BARRIERS →918.01 TRAFFIC BARRIER W BEAM/THRIE-BEAM
- 17:21, 3 October 2019 diff hist +2 908 REINFORCING STEEL →908.10 TIE DEVICES FOR CONCRETE PAVEMENT
- 17:17, 3 October 2019 diff hist +213 104 MAINTENANCE OF TRAFFIC →104.23.01 DESCRIPTION
- 16:58, 3 October 2019 diff hist +6 103 ENGINEERS OFFICE →103.03 CONSTRUCTION
- 16:57, 3 October 2019 diff hist -5 103 ENGINEERS OFFICE →103.03 CONSTRUCTION
- 17:53, 26 July 2019 diff hist +2 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 17:50, 26 July 2019 diff hist +1 109 PROJECT SCHEDULE →109.04 MEASUREMENT AND PAYMENT
- 17:41, 26 July 2019 diff hist +1 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 17:38, 26 July 2019 diff hist +1 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 17:34, 26 July 2019 diff hist +1 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 17:26, 26 July 2019 diff hist -11 109 PROJECT SCHEDULE →109.01.01 DEFINITIONS
- 17:26, 26 July 2019 diff hist -1 109 PROJECT SCHEDULE →109.01 DESCRIPTION
- 17:25, 26 July 2019 diff hist +12 109 PROJECT SCHEDULE →109.01.01 DEFINITIONS
- 17:16, 26 July 2019 diff hist 0 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 17:16, 26 July 2019 diff hist +52 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 17:07, 26 July 2019 diff hist +3 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 17:00, 26 July 2019 diff hist -1 109 PROJECT SCHEDULE →109.02 MATERIALS
- 16:57, 26 July 2019 diff hist +4,891 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 16:02, 26 July 2019 diff hist +3,845 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 15:50, 26 July 2019 diff hist +8,787 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 15:29, 26 July 2019 diff hist +3,330 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 15:00, 26 July 2019 diff hist 0 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 14:56, 26 July 2019 diff hist +3,070 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 14:45, 26 July 2019 diff hist +2,057 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 14:04, 26 July 2019 diff hist +1,457 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 13:57, 26 July 2019 diff hist +926 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 13:50, 26 July 2019 diff hist +2,859 109 PROJECT SCHEDULE →109.03 CONSTRUCTION
- 13:32, 26 July 2019 diff hist +10,502 109 PROJECT SCHEDULE
- 12:08, 26 July 2019 diff hist +173 N 109 PROJECT SCHEDULE Created page with "__NOTOC__ ======This is not a legal document. Please see disclaimer for more information.====== ======'''109 PROJECT SCHEDULE'''======"
- 11:33, 26 July 2019 diff hist -278 921 MISCELLANEOUS →921.06 TIMBER PRESERVATIVES
- 11:24, 26 July 2019 diff hist -52 921 MISCELLANEOUS →921.06 TIMBER PRESERVATIVES
- 19:03, 25 July 2019 diff hist +727 921 MISCELLANEOUS →921.06 TIMBER PRESERVATIVES
- 18:19, 25 July 2019 diff hist -86 CATEGORY 100 - PRELIMINARY current
- 18:18, 25 July 2019 diff hist -380 110 ACTIVITIES CHART PROJECT SCHEDULE →110.04 MEASUREMENT AND PAYMENT current
- 18:18, 25 July 2019 diff hist -58 110 ACTIVITIES CHART PROJECT SCHEDULE →110.03 CONSTRUCTION
- 18:18, 25 July 2019 diff hist -55 110 ACTIVITIES CHART PROJECT SCHEDULE →110.02 MATERIALS
- 18:18, 25 July 2019 diff hist -5,312 110 ACTIVITIES CHART PROJECT SCHEDULE →110.01 DESCRIPTION
- 18:16, 25 July 2019 diff hist -42 CATEGORY 100 - PRELIMINARY