Difference between revisions of "Standard Specifications For Construction And Materials"
Jump to navigation
Jump to search
| (5 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| + | ====== This is not the official version of the Standard Specifications for Construction and Materials. This version includes the latest Standard Specifications for Construction and Materials, as well as revisions approved through the Special Provisions Insert (SPI) process. Refer to the Invitation for Bids in the Contract Documents for specifications pertaining to contract work. Please see [https://www.roads.maryland.gov/mdotsha/pages/sscm.aspx?PageId=853&lid=SSP Standard Specifications for Construction and Materials] for the official version. ====== | ||
| + | |||
| + | |||
__NOTOC__ | __NOTOC__ | ||
| − | + | ||
==[[PART I: GENERAL PROVISIONS|PART I: GENERAL PROVISIONS]]== | ==[[PART I: GENERAL PROVISIONS|PART I: GENERAL PROVISIONS]]== | ||
==[[PART II: TERMS AND CONDITIONS|PART II: TERMS AND CONDITIONS]]== | ==[[PART II: TERMS AND CONDITIONS|PART II: TERMS AND CONDITIONS]]== | ||